<?xml version="1.0" encoding="UTF-8" ?>
<rss version="2.0">
    <channel>
        <title>Mazari Technologies - Blog</title>
        <link>http://www.mazaritechnologies.com/blog/</link>
        <description>Mazari Technologies - Blog</description>
                    <item>
                <title>Smart Infrastructure - The Benefits: Case Study</title>
                <link>http://www.mazaritechnologies.com/blog/params/post/4189603/smart-infrastructure---the-benefits-case-study</link>
                <pubDate>Fri, 09 Dec 2022 10:36:00 +0000</pubDate>
                <description>&lt;p&gt;&lt;b&gt;Part
one: Commercials&lt;/b&gt;&lt;/p&gt;

&lt;p&gt;&lt;b&gt;&lt;/b&gt;&lt;/p&gt;

&lt;p&gt;Working
with several clients lately, examining the real value of a SmartInfrastucture
approach, we share here some of our findings.&amp;nbsp;
From a commercial perspective alone, the numbers are astonishing.&amp;nbsp; Not just acquisition cost, but the nature of
reducing costs over time while improving performance has presented beyond compelling
business cases time and again.&lt;/p&gt;

&lt;p&gt;&lt;/p&gt;&lt;p&gt;The
comparisons we make here are based on real-world figures, from a live
production environment.&amp;nbsp; &lt;/p&gt;

&lt;p&gt;&lt;/p&gt;

&lt;p&gt;Server
embedded, cloud managed SmartInfrastructure does not easily compare to, for example,
dual controller based external storage arrays, or even all-flash SSD clusters.
This is down to the inherent design principal differences, but we can look at
overall commercials and in-life management and where significant advantage can
be found.&lt;/p&gt;

&lt;p&gt;&lt;/p&gt;

&lt;p&gt;This is the
first of a three-part study that looks at the following value elements of a SmartInfrastructure
approach:&lt;/p&gt;

&lt;p&gt;&lt;/p&gt;

&lt;p&gt;&lt;b&gt;Part
one: Commercials&lt;/b&gt;&lt;/p&gt;

&lt;p&gt;Acquisition
costs, upgrade costs, power consumption, rack space.&lt;/p&gt;

&lt;p&gt;&lt;b&gt;&lt;/b&gt;&lt;/p&gt;

&lt;p&gt;&lt;b&gt;Part
two: Simplicity&lt;/b&gt;&lt;/p&gt;

&lt;p&gt;Host technology,
licensing deployment, &amp;nbsp;in-life management.&lt;/p&gt;

&lt;p&gt;&lt;/p&gt;

&lt;p&gt;&lt;b&gt;Part 3: Speed
&amp;amp; agility&lt;/b&gt;&lt;/p&gt;

&lt;p&gt;Capacity
upgrade process, inherent security, multiple services on common platform,
sustainability.&lt;/p&gt;

&lt;p&gt;&lt;b&gt;Part one:
Commercials&lt;/b&gt;&lt;/p&gt;

&lt;p&gt;&lt;/p&gt;

&lt;p&gt;Historically,
right sizing of storage arrays up front for anticipated capacity requirements
was a crystal-ball exercise.&amp;nbsp; Vendors offer
discounts for volume, often based on financial year timing and quota
reasons.&amp;nbsp; The ‘end of fiscal year fire
sale’ is a tedious, predictable commercial exercise, mainly benefitting vendor salespeople,
often to the long-term detriment of their clients.&amp;nbsp; &lt;/p&gt;

&lt;p&gt;&lt;/p&gt;

&lt;p&gt;Firstly,
the unpredictable nature of pricing and order volume dependent discounts does
not allow for integrity of a business model.&amp;nbsp;
This is particularly true for service providers where predictability is
crucial to managing margins on product lines dependent on underlying storage
assets.&amp;nbsp; It’s great to get a ‘deal’ because
its &amp;lt;&lt;b&gt;&lt;i&gt;insert vendor name’s&lt;/i&gt;&lt;/b&gt;&amp;gt; &amp;nbsp;Q4, but can these prices be repeated six
months later?&amp;nbsp; Maybe, probably not though.&lt;/p&gt;

&lt;p&gt;&lt;/p&gt;

&lt;p&gt;Predicting
sales or data growth is tough enough month by month, year by year its next to
impossible, especially when offering any kind of elastic XaaS to a market.&amp;nbsp; So inevitably capacity has been over
procured, with large capex spends, and actual monetization occurring deep into service
life, if at all.&lt;/p&gt;

&lt;p&gt;&lt;/p&gt;

&lt;p&gt;Modular,
scale up/scale out, all flash solutions improved this position, allowing more
granularity in initial deployment, and increased predictability of pricing. &amp;nbsp;Most solutions however were either pod or
cluster configured and still required a minimum specification of ‘blocks’ to be
procured when capacity was required.&lt;/p&gt;

&lt;p&gt;&lt;/p&gt;

&lt;p&gt;This approach
was a significant improvement over crystal-balling controller based external
storage arrays.&amp;nbsp; Next generation SPU
based, offload solutions however, go a step further in predictability,
granularity and simplicity.&lt;/p&gt;

&lt;p&gt;&lt;/p&gt;

&lt;p&gt;&lt;b&gt;So, let’s
look at the numbers&lt;/b&gt;.&amp;nbsp; Using a Nebulon configuration there are
simply two line items to consider at acquisition:&amp;nbsp; &lt;u&gt;&lt;a href=&quot;https://www.mazaritechnologies.com/smartinfrastructure/&quot;&gt;The SPU card&lt;/a&gt;&lt;/u&gt;
 (one required per server host) and
management software subscription (again one per server host).&amp;nbsp; Note here, licensing is per physical host and
not capacity dependent.&amp;nbsp; This allows for
future capacity upgrades at ultra-low cost.&lt;/p&gt;&lt;p&gt;&lt;br&gt;&lt;/p&gt;&lt;p&gt;&lt;/p&gt;&lt;table class=&quot;moze-table-border&quot;&gt;&lt;tbody&gt;&lt;tr&gt;&lt;td&gt;&lt;b&gt;Smart V all-flash&lt;/b&gt;&lt;br&gt;&lt;/td&gt;&lt;td&gt;&lt;b&gt;Build &lt;br&gt;&lt;/b&gt;&lt;/td&gt;&lt;td&gt;&lt;b&gt;Hardware &lt;br&gt;&lt;/b&gt;&lt;/td&gt;&lt;td&gt;&lt;b&gt;Capital &lt;br&gt;&lt;/b&gt;&lt;/td&gt;&lt;td&gt;&lt;b&gt;TB &lt;br&gt;&lt;/b&gt;&lt;/td&gt;&lt;td&gt;&lt;b&gt;GB &lt;br&gt;&lt;/b&gt;&lt;/td&gt;&lt;td&gt;&lt;b&gt;&lt;br&gt;&lt;/b&gt;&lt;/td&gt;&lt;td&gt;&lt;b&gt;&lt;br&gt;&lt;/b&gt;&lt;/td&gt;&lt;td&gt;&lt;b&gt;$/TB &lt;br&gt;&lt;/b&gt;&lt;/td&gt;&lt;td&gt;&lt;b&gt;$/GB &lt;br&gt;&lt;/b&gt;&lt;/td&gt;&lt;td&gt;&lt;b&gt;Depreciated $/GB &lt;br&gt;&lt;/b&gt;&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;All-flash SSD&lt;/b&gt;&lt;br&gt;&lt;/td&gt;&lt;td&gt;Storage Nodes&lt;br&gt;&lt;/td&gt;&lt;td&gt;&amp;nbsp;9&lt;/td&gt;&lt;td&gt;&amp;nbsp;$861,144&lt;/td&gt;&lt;td&gt;&amp;nbsp;380&lt;/td&gt;&lt;td&gt;&amp;nbsp;380,160&lt;/td&gt;&lt;td&gt;&lt;br&gt;&lt;/td&gt;&lt;td&gt;&lt;br&gt;&lt;/td&gt;&lt;td&gt;&amp;nbsp;3&lt;/td&gt;&lt;td&gt;&amp;nbsp;0.03&lt;/td&gt;&lt;td&gt;&amp;nbsp;0.0005&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;ESX hosts&lt;br&gt;&lt;/td&gt;&lt;td&gt;&amp;nbsp;13&lt;/td&gt;&lt;td&gt;&amp;nbsp;$260,000&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;&lt;br&gt;&lt;/td&gt;&lt;td&gt;&lt;br&gt;&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;b&gt;$1,121,144&lt;/b&gt;&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;&lt;br&gt;&lt;/td&gt;&lt;td&gt;&lt;br&gt;&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;&amp;nbsp;&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;b&gt;Smart Infrastructure&lt;/b&gt;&lt;br&gt;&lt;/td&gt;&lt;td&gt;Nebulon Servers&lt;br&gt;&lt;/td&gt;&lt;td&gt;&amp;nbsp;13&lt;/td&gt;&lt;td&gt;&lt;b&gt;&amp;nbsp;&lt;u&gt;$695,058&lt;/u&gt;&lt;/b&gt;&lt;/td&gt;&lt;td&gt;&amp;nbsp;399&lt;/td&gt;&lt;td&gt;&amp;nbsp;399,360&lt;/td&gt;&lt;td&gt;&lt;br&gt;&lt;/td&gt;&lt;td&gt;&lt;br&gt;&lt;/td&gt;&lt;td&gt;&amp;nbsp;1.740&lt;/td&gt;&lt;td&gt;&amp;nbsp;0.017&lt;/td&gt;&lt;td&gt;&amp;nbsp;0.000290&lt;/td&gt;&lt;/tr&gt;&lt;/tbody&gt;&lt;/table&gt;&lt;br&gt;

&lt;p&gt;&lt;/p&gt;





&lt;p&gt;Working with
a thirteen-host environment in this example, depreciated over 60 months
compared to acquisition cost of an all-flash SSD based solution of a similar
size.&amp;nbsp; Server specification remains
consistent between both build examples, with each SmartInfrastructure server host
configured with &lt;b&gt;six&lt;/b&gt; 8Tb SSD’s.&lt;/p&gt;

&lt;p&gt;&lt;/p&gt;

&lt;p&gt;&lt;b&gt;&lt;i&gt;Straight
dollar acquisition costs see an approximate 40% reduction&lt;/i&gt;&lt;/b&gt; for SPU based SmartInfrastructure
build Vs all-flash SSD.&amp;nbsp; Also, 18RU
reduction in DC space, and associated 4.9Kwh power reduction. &lt;/p&gt;

&lt;p&gt;Here comes the
fun part! By modifying the SSD configuration in the same hosts from six 8Tb SSDs
to twelve 8Tb SSD’s we see the following:&lt;/p&gt;&lt;p&gt;&lt;/p&gt;&lt;table class=&quot;moze-table-border&quot;&gt;&lt;tbody&gt;&lt;tr&gt;&lt;td&gt;&lt;b&gt;Smart V all-flash&lt;/b&gt;&lt;br&gt;&lt;/td&gt;&lt;td&gt;&lt;b&gt;Build &lt;br&gt;&lt;/b&gt;&lt;/td&gt;&lt;td&gt;&lt;b&gt;Hardware &lt;br&gt;&lt;/b&gt;&lt;/td&gt;&lt;td&gt;&lt;b&gt;Capital &lt;br&gt;&lt;/b&gt;&lt;/td&gt;&lt;td&gt;&lt;b&gt;TB &lt;br&gt;&lt;/b&gt;&lt;/td&gt;&lt;td&gt;&lt;b&gt;GB &lt;br&gt;&lt;/b&gt;&lt;/td&gt;&lt;td&gt;&lt;b&gt;&lt;br&gt;&lt;/b&gt;&lt;/td&gt;&lt;td&gt;&lt;b&gt;&lt;br&gt;&lt;/b&gt;&lt;/td&gt;&lt;td&gt;&lt;b&gt;$/TB &lt;br&gt;&lt;/b&gt;&lt;/td&gt;&lt;td&gt;&lt;b&gt;$/GB &lt;br&gt;&lt;/b&gt;&lt;/td&gt;&lt;td&gt;&lt;b&gt;Depreciated $/GB &lt;br&gt;&lt;/b&gt;&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt; &lt;b&gt;All-flash SSD&lt;/b&gt;&lt;br&gt;&lt;/td&gt;&lt;td&gt;Storage Nodes&lt;br&gt;&lt;/td&gt;&lt;td&gt; 9&lt;/td&gt;&lt;td&gt; $861,144&lt;/td&gt;&lt;td&gt; 380&lt;/td&gt;&lt;td&gt; 380,160&lt;/td&gt;&lt;td&gt;&lt;br&gt;&lt;/td&gt;&lt;td&gt;&lt;br&gt;&lt;/td&gt;&lt;td&gt; 3&lt;/td&gt;&lt;td&gt; 0.03&lt;/td&gt;&lt;td&gt; 0.0005&lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td&gt;ESX hosts&lt;br&gt;&lt;/td&gt;&lt;td&gt; 13&lt;/td&gt;&lt;td&gt; $260,000&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td&gt;&lt;br&gt;&lt;/td&gt;&lt;td&gt;&lt;br&gt;&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td&gt; &lt;b&gt;$1,121,144&lt;/b&gt;&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td&gt;&lt;br&gt;&lt;/td&gt;&lt;td&gt;&lt;br&gt;&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;/tr&gt;&lt;tr&gt;&lt;td&gt; &lt;b&gt;Smart Infrastructure&lt;/b&gt;&lt;br&gt;&lt;/td&gt;&lt;td&gt;Nebulon Servers&lt;br&gt;&lt;/td&gt;&lt;td&gt; 13&lt;/td&gt;&lt;td&gt;&lt;b&gt; &lt;u&gt;$835,458&lt;/u&gt;&lt;/b&gt;&lt;/td&gt;&lt;td&gt;998&lt;br&gt;&lt;/td&gt;&lt;td&gt;998,400&lt;br&gt;&lt;/td&gt;&lt;td&gt;&lt;br&gt;&lt;/td&gt;&lt;td&gt;&lt;br&gt;&lt;/td&gt;&lt;td&gt;0.837&lt;br&gt;&lt;/td&gt;&lt;td&gt; 0.017&lt;/td&gt;&lt;td&gt; 0.000139&lt;/td&gt;&lt;/tr&gt;&lt;/tbody&gt;&lt;/table&gt;&lt;br&gt;&lt;p&gt;Acquisition
cost for SPU rises due to additional capacity (remains significantly below
all-flash option) but critically capacity is now &lt;b&gt;&lt;i&gt;three times larger&lt;/i&gt;&lt;/b&gt;
than the all-flash option.&amp;nbsp; Depreciated
over the same 60-month period this represents&lt;b&gt;&lt;i&gt; an approximate 80%
reduction in $/GB costs vs all-flash.&lt;/i&gt;&lt;/b&gt;&lt;/p&gt;

&lt;p&gt;&lt;b&gt;&lt;i&gt;&lt;/i&gt;&lt;/b&gt;&lt;/p&gt;

&lt;p&gt;Hosts specified
in the example are based on 2U recognized vendor configurations, allowing for
up to &lt;b&gt;24 SSDs&lt;/b&gt; per host. &lt;/p&gt;

&lt;p&gt;&lt;b&gt;&lt;i&gt;&lt;/i&gt;&lt;/b&gt;&lt;/p&gt;

&lt;p&gt;&lt;b&gt;Conclusion&lt;/b&gt;&lt;/p&gt;

&lt;p&gt;&lt;/p&gt;

&lt;p&gt;The
commercials alone of an SPU based SmartInfrastructure deployment are compelling.&amp;nbsp; In parts two and three we will look at Simplicity
and Agility and the game changing value an SPU deployment can bring when
upgrading and delivering in-life services.&lt;/p&gt;</description>
            </item>
                    <item>
                <title>SmartInfrastructure for power efficiency</title>
                <link>http://www.mazaritechnologies.com/blog/params/post/4177264/smartinfrastructure-for-power-efficiency</link>
                <pubDate>Wed, 23 Nov 2022 14:04:00 +0000</pubDate>
                <description>&lt;p&gt;&lt;span style=&quot;color: #082c74&quot;&gt;Power efficiency
has become a major issue, right now, more so than ever before.&amp;nbsp; It’s not just the sheer cost of power, but
the availability of it, and the social impact of using it.&amp;nbsp; A critical component of building SmartInfrastructure
environments is reducing power usage and rack density, while increasing
capacity, performance and management simplicity.&lt;/span&gt;&lt;/p&gt;&lt;span style=&quot;color: #082c74&quot;&gt;

&lt;/span&gt;&lt;span style=&quot;color: #082c74&quot;&gt;

&lt;/span&gt;&lt;p&gt;&lt;span style=&quot;color: #082c74&quot;&gt;We believe
that server embedded solutions that use existing, familiar platforms, and embed
offload capability not only reduce server power consumption considerably, but
can create a common core to edge solution environment.&amp;nbsp; Hyperscalers have been doing this for years,
and it’s now much easier for Enterprise to replicate this..&lt;/span&gt;&lt;/p&gt;&lt;span style=&quot;color: #082c74&quot;&gt;

&lt;/span&gt;&lt;span style=&quot;color: #082c74&quot;&gt;

&lt;/span&gt;&lt;p&gt;&lt;span style=&quot;color: #082c74&quot;&gt;This
excellent paper from #nvidia does a lot of the analyses on the numbers, for us it’s
a real validation of the model..&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;a href=&quot;https://nvdam.widen.net/s/trhb7wbkmb/nvidia-dpu-power-efficiency-white-paper-2508650&quot; target=&quot;_self&quot;&gt;nvidia-dpu-power-efficiency-white-paper&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;br&gt;&lt;/p&gt;

&lt;p&gt;&lt;/p&gt;#hybridcloud
#datacentre #smartinfrastructure</description>
            </item>
                    <item>
                <title>We are live!</title>
                <link>http://www.mazaritechnologies.com/blog/params/post/4171808/</link>
                <pubDate>Wed, 16 Nov 2022 13:17:00 +0000</pubDate>
                <description>&lt;p&gt;&lt;span style=&quot;color: #082c74&quot;&gt;Our metamorphosis is complete, thanks for dropping in!&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span style=&quot;color: #082c74&quot;&gt;We&#039;ll be updating news and market related content here regularly.&amp;nbsp; &lt;br&gt;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span style=&quot;color: #082c74&quot;&gt;It&#039;s another week of volatility in international affairs, and with inflation across Europe rising to unprecedented levels,&amp;nbsp; we&#039;re likely to see reserve banks head towards interest rate hikes sooner than expected.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span style=&quot;color: #082c74&quot;&gt;&#039;The Trump&#039; announces another US presidential run, further dividing the GOP and unsettling nerves.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span style=&quot;color: #082c74&quot;&gt;Teams from around the world arrive in Qatar for the FIFA 2022 World Cup later this month, still amid some controversy, and the world population tips past 8 billion humans.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span style=&quot;color: #082c74&quot;&gt;There seems to be massive market impacting events on a daily basis, with technology security concerns rising along with the global population.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span style=&quot;color: #082c74&quot;&gt;An interesting perspective from the &lt;/span&gt;&lt;a href=&quot;https://www.weforum.org/agenda/2022/11/as-cyber-attacks-increase-heres-how-ceos-can-improve-cyber-resilience/&quot; target=&quot;_self&quot;&gt;WEF: How CEO&#039;s can increase cyber-security&lt;/a&gt;&lt;/p&gt;&lt;p&gt;&lt;br&gt;&lt;/p&gt;&lt;p&gt;&lt;br&gt;&lt;/p&gt;&lt;p&gt;&lt;br&gt;&lt;/p&gt;</description>
            </item>
            </channel>
</rss>